DOĞRU MÜHENDİSLİK is an independent engineering firm with 29 years of experience in transportation, urban infrastructure, structures, energy, and water resources projects, delivering safe, economical, and sustainable engineering solutions through an interdisciplinary approach and a boutique service mindset.
The Tuzköy Hydroelectric Power Plant (HPP) Project is located on the Kızılırmak River, within the boundaries of Gülşehir District of Nevşehir Province, downstream of the Yamula and Bayramhacılı Dams.
The structures included in the project consist of the following components:
| Design Discharge | 60 m3/s |
|---|---|
| Number of Units | 2 units |
| Turbine Type | Francis |
| Regulator Type | Inflatable Weir |
© 1986-2026 Doğru Engineering | All rights reserved.
Developed by: Idesa Creative